Bishop84 wrote:I believe that the bus/coach bays included in the original MSCP planning application were later removed from the plans. I don't know if these were meant to be for a coach facility.
I've had a look back through the planning apps and there were 3 shallow angle coach bays located between the ledger building and the MSCP in the original phase 1 application. Taxis and coaches would have entered from the south west and exited to the north east along this one-way road - the taxi rank looping through the interior of the car park. There are no coach bays in the revised plans which relocate the entrance of the car park to the north of the structure and have the taxis turning west on exit into the now two-way access road.
I couldn't find any narrative explanation for why the coach bays have been dropped, but I assume its because the access road between the Ledger and the MSCP no longer passes through the site and there is not enough room for a coach to turn around and exit the same way it came in. But I doubt that the coach bays were just some speculative, "nice to have", feature dreamt up by the architects - presumably TFW, Network Rail or the Council asked for them to be included?
Even if they weren't intended for long distance coach operators to use, there surely still needs to be somewhere for the inevitable "Rail Replacement Bus" to park!