if it's about Cardiff.. Sport, Entertainment, Transportation, Business, Development Projects, Leisure, Eating, Drinking, Nightlife, Shopping, Train Spotting! etc.. then we want it here!
I noticed today that the plot for number 4 has been totally cleared, I'm assuming for storage of materials for number 3 but it would be nice if number 4 was starting soon.
I noticed the nunber 4 plot being marked out today, it would be great if that is actually starting, I can't see why else they'd be doing it.
As for the student tower the other side of the canal there's nobody there today so maybe a site visit of some sort in advance of starting? I saw some people inspectkng the plot before Xmas as well so hopefully a start soon.
I have to admit im getting confused by it all. I know that so far we have had the driscoll buildings, numbers 1 and 2 with 3 under construction. I take it number 4 is next to that by the car park and the student buildings are between 1 and 2 and the driscoll buildings. So what is going on the other side of the feeder
CGI of the "Herbert Street Site" as student accomodation.
No. 5 Capital Quarter is the other tower, which was earmarked for residential flats. It'll be interesting to see if they're actually going ahead with that now or pick it up later.
Attachments
30902SJP_MAI_ZZflats_100816-01JPG.jpg (45.09 KiB) Viewed 11040 times