PostTue Jul 15, 2014 3:47 pm

Might as well get the ball rolling with this topic.

The replacement of the Windsor Road bridge over the South Wales Mainline goes before the planning committee tomorrow (July 16).
The work is to replace the bridge in its entirety, albeit with a slightly different (raised) design to accommodate heavier road loads and future electrification of the line.
The work is due to start in December 2014/January 2015 and should last 12-18 months, to facilitate this the Butetown branch railway will be closed and the line removed to create a temporary access road to the underground car park of the Peacocks Headquarters - no idea if it will be reinstated upon completion, maybe when the Metro kicks off? (lol)
Some days you are the pigeon and some days you are the statue...
Offline

Simon_SW17

  • Posts: 594
  • Joined: Tue Jul 15, 2014 4:07 pm

Re: South Wales Mainline Electrification

PostTue Jul 15, 2014 4:10 pm

It seems weird to build a new platform for the Bay branch and then close the line for 18 months, is that definitely happening?
Offline

Welshlad86

  • Posts: 6
  • Joined: Tue Jul 15, 2014 4:18 pm

Re: South Wales Mainline Electrification

PostTue Jul 15, 2014 4:19 pm

The butetown branch is not the bay line.

It goes to the steelworks
Offline

MrJamesBrown

  • Posts: 34
  • Joined: Wed Jul 16, 2014 7:20 pm
  • Location: Cardiff

Re: South Wales Mainline Electrification

PostWed Jul 16, 2014 7:45 pm

Does everyone agree that this thread should be used for all improvements to the railway locally or do projects like the rebuilding of Queen Street Station and Central Station deserve separate threads as they are not directly linked to the electrification?
Offline

redragon

  • Posts: 154
  • Joined: Wed Jul 16, 2014 5:31 pm

Re: South Wales Mainline Electrification

PostWed Jul 16, 2014 9:06 pm

New one for station upgrades and new one for metro?
Offline

MrJamesBrown

  • Posts: 34
  • Joined: Wed Jul 16, 2014 7:20 pm
  • Location: Cardiff

Re: South Wales Mainline Electrification

PostWed Jul 16, 2014 11:35 pm

redragon wrote:New one for station upgrades and new one for metro?


That was my thinking
Offline

murfilicious

  • Posts: 183
  • Joined: Tue Jul 15, 2014 3:41 pm
  • Location: Cardiff

Re: South Wales Mainline Electrification

PostMon Oct 13, 2014 8:41 am

Two applications in with the planning committee this week - one to replace the bridge at the bottom of Trowbridge Road over the main line with a raised footpath/cycle way, and the other to simply remove the bridge over the mainline at the bottom of Wentloog Road (been inaccessible for years, so long in fact that I thought it had already been removed!).

As the mainline electrification continues I'd expect more of these applications to appear - particularly New Road, Brachdy Lane, Beresford Road and Splott Road. Southern Way and Central Link already have enough clearance, Beresford Road I am uncertain on...
Some days you are the pigeon and some days you are the statue...

Jantra

Re: South Wales Mainline Electrification

PostMon Oct 13, 2014 1:05 pm

has the mainline electrification actually started then? I assumed it would start near London and work its way towards Swansea but I hadn't realised it had started yet.
Offline

murfilicious

  • Posts: 183
  • Joined: Tue Jul 15, 2014 3:41 pm
  • Location: Cardiff

Re: South Wales Mainline Electrification

PostMon Oct 13, 2014 1:31 pm

Jantra wrote:has the mainline electrification actually started then? I assumed it would start near London and work its way towards Swansea but I hadn't realised it had started yet.

London to Bristol section due for completion by 2016, and then Cardiff to Swansea by 2017 but at nowhere on the Network Rail website does it state if the actual process of electrification has started yet...
May just be facilitating works at the moment (raising bridges etc.)
Some days you are the pigeon and some days you are the statue...
Offline

Ash

  • Posts: 1040
  • Joined: Wed Jul 30, 2014 12:28 pm

Re: South Wales Mainline Electrification

PostMon Oct 13, 2014 1:47 pm

Most of the modifiaction work east of Swindon seems to have been completed. As I understand it the erection of pylons, wires etc is done in one go by a rolling works unit. Presumably that's timed to start once the modification part of the job is sufficiently advanced.