Page 46 of 67

Re: Metro

PostPosted: Fri Jan 19, 2018 5:55 pm
by Bishop84
Msmurf wrote:The sports village is the wrong side of the Taff to connect to the Bay (without building an expensive bridge). But in any case there is a spur to ISV planned off the Penarth line.


They could have used the old freight line that existed to the old wharfs etc. where the ISV is but alas that has already been built over along most of its route.

Re: Metro

PostPosted: Fri Jan 19, 2018 10:36 pm
by Msmurf
Bishop84 wrote:
Msmurf wrote:The sports village is the wrong side of the Taff to connect to the Bay (without building an expensive bridge). But in any case there is a spur to ISV planned off the Penarth line.


They could have used the old freight line that existed to the old wharfs etc. where the ISV is but alas that has already been built over along most of its route.


That is effectively what is planned.. following the line of Ferry Road from Sports Village, and joining up with tram line along Penarth Road near Grangetown Station.

Not using the old freight line directly, but running closely parallel to it

Re: Metro

PostPosted: Sat Jan 20, 2018 9:42 am
by Msmurf
I have been looking through the plans in detail and we will lose a lot of East West connectivity throuh Cardiff Central - Barry lines will no longer travel through to Pontypridd, and Penarth lines will no longer connect to Queen Street.

The worst connection will be the City Line which will initially be a HR shuttle from Radyr to CC but with no onward connection to Queen Street and no possibility of Pontypridd trains using this route as at present.

There are longer term plans to convert this line to LR and connect to Creigiau and beyond, but this will leave the existing tracks near Canton Depot and run along Cowbridge Road and St Mary St increasing journey times from Ninian Park to Central significantly.

The problem is that the Barry line will continue to be HR and this cuts off City Line before Central preventing a through LR service. Instead of street running from Canton, I would have thought a grade separated junction - putting Barry line into an underpass under City Line - or City Line on a flyover - would be a better option increasing the viability of NW Corridor.

Re: Metro

PostPosted: Mon Jan 22, 2018 8:04 am
by Msmurf
There are now Master Plans and lots of construction detail for the Taffs Well depot now published on TfW website.

I am starting to feel very optimistic about this project now!

Edit: well I was optimistic until I read in the construction strategy that depot is due to open in Q4 2021. ...that means we are a long way from a working Metro....

Re: Metro

PostPosted: Mon Feb 05, 2018 11:53 am
by Mr Blue Sky
Will Valley Lines’ electrification go ahead? Sion Barry thinks maybe, maybe not...

https://www.walesonline.co.uk/business/ ... p-14238327

Re: Metro

PostPosted: Sat Feb 24, 2018 9:40 am
by LocalResident

Re: Metro

PostPosted: Sat Feb 24, 2018 11:09 am
by Cen
halfnhalf wrote:and then there were two.. hahaha
Whats the betting that carwyn jones will announce that the assembly will run the metro after everyone else drops out
another nail in the coffin of the failed socialist experiment that we call devolution.
meanwhile the roads and motorway in south wales are in a shocking state all the road surface is breaking up and litter evrywhere
like living in a backward country it is
never mind build another 50 bars that will keep the locals happy
So a private company pulls out of a bid because another private company goes bust, and somehow it’s the Welsh Government’s fault. Oh and of course, them terrible roads. Once again I can’t understand what point you’re trying to make.

Re: Metro

PostPosted: Sat Feb 24, 2018 11:44 am
by Simon__200
Yes, it's the fault of politics. Socialism in particular clearly caused the weather that made the rain water freeze and create pot holes in the roads.

Lunatic klaxon!

Re: Metro

PostPosted: Tue May 22, 2018 11:02 am
by Cwlcymro
Apparently the new Wales rail franchise owner (and Metro operator) will be officially announced today or tomorrow morning. The announcement will be made simultaneously in the Assembly and at the Stock Exchange. We won't get any further details of what was in the winning bid until late next week as there's a 10 days waiting period for the losing bid to appeal.

Re: Metro

PostPosted: Tue May 22, 2018 11:29 am
by Kyle
Cwlcymro wrote:Apparently the new Wales rail franchise owner (and Metro operator) will be officially announced today or tomorrow morning. The announcement will be made simultaneously in the Assembly and at the Stock Exchange. We won't get any further details of what was in the winning bid until late next week as there's a 10 days waiting period for the losing bid to appeal.


Let's hope the losers don't appeal or they'll have to delay telling us anything about the winning bid while the appeal is in process I guess.