
- Posts: 881
- Joined: Tue Jul 15, 2014 10:50 pm
An outline application by Taylor Wimpey for a further 2500 homes between Lisvane and Pontprennau has gone in.
Its reported by Wales Online:
https://www.walesonline.co.uk/news/local-news/lisvane-cardiff-housing-planning-application-16871149
And the application is here:
https://planningonline.cardiff.gov.uk/online-applications/applicationDetails.do?keyVal=_CARDIFF_DCAPR_128640&activeTab=summary
Key details on quantum of proposal:
- 2,500 new homes
- a care home
- a primary school
- land reserved for a secondary school if required (could be given popularity of Cardiff High, St Teilos and Bro Edern already)
- A1, A2 and A3 (around 50,000 square feet)
- library, community centre, doctors surgery, leisure facility (45,000 square feet)
- office and employment space (upto 300,000 square feet)
- quite a lot of green space, (52 hectares)
Further information
- It consists of two parts: one between 'Churchlands' and Cardiff Gate Business Park; the other between Churchlands and Lisvane Resevoir
- Non-resi space in three main areas: a 'district centre'; an 'employment area' next to the M4; and an 'employment-led mixed use area' abutting Cardiff Gate Business park. I think the one next to the M4 is unlikely to happen due to poor access and is being put there as a 'buffer' between the resi and noise from the M4.
- they propose including some 4 - 5 storey apartment buildings in the district centre
- Looks to be predominantly red brick, but some rendered and grey brick.
- Accessed from Ty Draw Road, Lisvane Road and Heol Glandulais, and bus gate to/from Cardiff Gate Business Park
- They propose a village square/green between the school and retail and community uses
'Neighbourhoods'
- 'Malthouse Urban Quarter' - the district centre, with high density, terraced houses, apartments above shops and community uses
- 'Parkwall Mixed Use Community' - a mix of resi to the west and higher density and mixed use to the east as it merges into Cardiff Gate Business Park
- 'Mill Farm Fields' - to the north of the main site, with a mix of detached, semi, detached and terraced. Higher land here means layout designed to maximise views over the city
- 'Upper Ty-Draw' - to the south of the main site, mostly residential, with lower density to the south and higher density to the north as it approaches the district centre
- 'Lisvane Meadows' - to the north of the western site, mostly residential with mix of property types and mid-density
- 'Resevoir Park - to the south of the western site, abutting Lisvane resevoir. Low density, detached properties on large plots, designed to feel 'rural'.
Phasing:
- starting in 2020
- starting from the south (upper ty draw) and east (parkwall mixed use) of the main site over the first 5 years
- primary school and some retail / community use within 4 - 6 years
- employment mixed use area next to Cardiff Gate by 2027
- completed by 2035, with Lisvane part (near resevoir) the final phase
Its reported by Wales Online:
https://www.walesonline.co.uk/news/local-news/lisvane-cardiff-housing-planning-application-16871149
And the application is here:
https://planningonline.cardiff.gov.uk/online-applications/applicationDetails.do?keyVal=_CARDIFF_DCAPR_128640&activeTab=summary
Key details on quantum of proposal:
- 2,500 new homes
- a care home
- a primary school
- land reserved for a secondary school if required (could be given popularity of Cardiff High, St Teilos and Bro Edern already)
- A1, A2 and A3 (around 50,000 square feet)
- library, community centre, doctors surgery, leisure facility (45,000 square feet)
- office and employment space (upto 300,000 square feet)
- quite a lot of green space, (52 hectares)
Further information
- It consists of two parts: one between 'Churchlands' and Cardiff Gate Business Park; the other between Churchlands and Lisvane Resevoir
- Non-resi space in three main areas: a 'district centre'; an 'employment area' next to the M4; and an 'employment-led mixed use area' abutting Cardiff Gate Business park. I think the one next to the M4 is unlikely to happen due to poor access and is being put there as a 'buffer' between the resi and noise from the M4.
- they propose including some 4 - 5 storey apartment buildings in the district centre
- Looks to be predominantly red brick, but some rendered and grey brick.
- Accessed from Ty Draw Road, Lisvane Road and Heol Glandulais, and bus gate to/from Cardiff Gate Business Park
- They propose a village square/green between the school and retail and community uses
'Neighbourhoods'
- 'Malthouse Urban Quarter' - the district centre, with high density, terraced houses, apartments above shops and community uses
- 'Parkwall Mixed Use Community' - a mix of resi to the west and higher density and mixed use to the east as it merges into Cardiff Gate Business Park
- 'Mill Farm Fields' - to the north of the main site, with a mix of detached, semi, detached and terraced. Higher land here means layout designed to maximise views over the city
- 'Upper Ty-Draw' - to the south of the main site, mostly residential, with lower density to the south and higher density to the north as it approaches the district centre
- 'Lisvane Meadows' - to the north of the western site, mostly residential with mix of property types and mid-density
- 'Resevoir Park - to the south of the western site, abutting Lisvane resevoir. Low density, detached properties on large plots, designed to feel 'rural'.
Phasing:
- starting in 2020
- starting from the south (upper ty draw) and east (parkwall mixed use) of the main site over the first 5 years
- primary school and some retail / community use within 4 - 6 years
- employment mixed use area next to Cardiff Gate by 2027
- completed by 2035, with Lisvane part (near resevoir) the final phase