Re: Eastern Bay Link

PostSat Apr 22, 2017 12:37 pm

Simon__200 wrote:
daearegwr wrote:Not sure if this has already been posted but looks like the new road will have a 50mph speed limit eastbound and 40mph limit westbound. https://www.cardiff.gov.uk/ENG/resident ... 0FINAL.pdf

What's the rationale behind that disparity. Both are pretty much identical short sections of dualed carriageway, separated by a similarly sized roundabout, aren't they?


It's because public sector workers are involved. Nothing makes sense
Offline
User avatar

Zach

  • Posts: 548
  • Joined: Tue Jul 15, 2014 9:25 pm

Re: Eastern Bay Link

PostSat Apr 22, 2017 1:38 pm

They know its going to be queued most of the time, so why even bother with speed limits.

The Newport road southern relief road is great smashing dual carriage with 30mph zones and enough roundabouts to ensure at least one HGV topples over every month.
Offline

RandomComment

  • Posts: 881
  • Joined: Tue Jul 15, 2014 10:50 pm

Re: Eastern Bay Link

PostThu Jun 01, 2017 6:48 pm

Offline

Baysailor

  • Posts: 63
  • Joined: Tue Apr 26, 2016 7:33 pm

Re: Eastern Bay Link

PostWed Jun 07, 2017 9:32 am

Does anyone know if the link was used over the weekend to transport coaches. Original plan was to have it open for trial runs of selected coaches before the general public opening - which must be soon.
Offline

daearegwr

  • Posts: 86
  • Joined: Wed Dec 07, 2016 11:13 am

Re: Eastern Bay Link

PostThu Jun 15, 2017 10:41 am

Offline
User avatar

Zach

  • Posts: 548
  • Joined: Tue Jul 15, 2014 9:25 pm

Re: Eastern Bay Link

PostTue Jul 11, 2017 5:14 pm

Just driven back into Cardiff and the Eastern bay link was queueing east bound!
The queue went all the way to the A48 junction, then all the way to the A48M, then all the way to the M4 then all the way to Tunnels. This was nothing compared to the queue west bound which was back to the toll plaza.
Anyone I mention Cardiff to always comments on how bad the traffic is, it must put off so much inward investment.

As it says on the Gantry Signs
PLAN AHEAD!
Offline

daearegwr

  • Posts: 86
  • Joined: Wed Dec 07, 2016 11:13 am

Re: Eastern Bay Link

PostWed Jul 12, 2017 11:49 am

Zach wrote:Just driven back into Cardiff and the Eastern bay link was queueing east bound!
The queue went all the way to the A48 junction, then all the way to the A48M, then all the way to the M4 then all the way to Tunnels. This was nothing compared to the queue west bound which was back to the toll plaza.
Anyone I mention Cardiff to always comments on how bad the traffic is, it must put off so much inward investment.

As it says on the Gantry Signs
PLAN AHEAD!


Traffic was especially bad yesterday as Coldplay were on in the stadium but you're right traffic in Cardiff is becoming a problem and this tiny bit of road whilst welcome doesn't really solve the problem
Offline

moyceyyy

  • Posts: 340
  • Joined: Sun Feb 12, 2017 2:03 pm
  • Location: Llanelli

Re: Eastern Bay Link

PostWed Jul 12, 2017 11:25 pm

Still cant believe it wasnt built to grade separated standard. So much news about Cardiff needing to be forward thinking in the Council/WAG Cardiff LDP, yet they spent all this money on a road which will become one of wales most notorious traffic hotspots in the next 5 years, with all the 40,000 houses being built.

Another example of one of the WAG's "oh we will upgrade it when it actually needs doing" (at triple the cost) attitude.

Have they seriously not learned since the whole Newport M4 debacle?